Boxpro Express Logo
BoxproExpress
Custom Sheds & Home Services
CALL (530) 443-8990

Yuba City, Marysville, Lincoln & Roseville

Fast ยท Transparent ยท Zero Pressure

Get Instant Ballpark Pricing

Choose your project below. Configure your custom 10x12 shed with live materials & labor calculations, or request a fast estimate for handyman, junk hauling, or deck repair.

Call or Text (530) 443-8990Average callback under 15 minutes
100% CRC R105.2 Permit-Free
HOA ARC Match (Lincoln Hills & Placer)
CA AB 2622 Minor Work Capped
4-Day Turnkey Delivery
Option 1

Custom Backyard Shed Estimator

Customize size, siding, foundation, and upgrades with real-time ballpark totals.

Model: The Sutter Studio (10ร—12 Modern Monoslope)
Interactive 3D Engine โ€ข Open Source

Want to orbit & customize in full 360ยฐ 3D?

Spin 360ยฐ, inspect real 2x4 framing studs, swap Redwood & Cedar sidings, and preview daylight vs. dusk lighting in our real-time 3D Studio.

Launch 3D Studio
Interactive Custom Shed Configurator

Build Your Custom Sutter Studio (10ร—12)

Select your desired finish level, foundation, and lifestyle upgrades below to see your instant ballpark price. Lock in your estimate for a free on-site yard measurement with zero sales pressure.

Select Architecture Model (8 Pre-Configured Editions)Click any model below to load specs & pricing
The Sutter Studio (10x12 Modern Monoslope)
10โ€ฒ ร— 12โ€ฒ (120 Sq Ft)
100% Permit-Exempt (CRC R105.2)Built in 3โ€“5 DaysBase from $11,950

The Sutter Studio (10x12 Modern Monoslope)

Modern Monoslope Roof (9.5' to 7.5' slope)
Western Red Cedar Vertical Siding Included
Standing Seam Metal Roof or 30-Yr Shingles
100% Permit-Exempt under CRC Section R105.2
1

Select Base Finish Tier

10โ€ฒ ร— 12โ€ฒ (120 Sq Ft)
Not sure which tier fits? Compare Base Shell vs Turnkey inclusions.
10ร—12 Matrix Page โ†’
Tier 1: Base Workshop (w/ 1kWh Off-Grid Solar)
Hand-Framed Shell + Solar
Tier 1: Base Workshop (w/ 1kWh Off-Grid Solar)
$11,950

Hand-framed 2x4 walls (16" OC), 3/4" T&G subfloor, 30-year architectural shingles or standing seam, Western Red Cedar siding, 36" full-lite glass door, and level concrete footing blocks. INCLUDES Jackery Explorer 1000 (1kWh LFP battery) + 200W solar panel for lights, laptops, and tools. Zero trenching required. Full on-site assembly included.

Tier 2: Climate Studio (Drywall, LVP & Mini-Split)
โญ 4-Season Climate Den
Tier 2: Climate Studio (Drywall, LVP & Mini-Split)
$20,550

Everything in Tier 1 + full R-13 wall / R-19 ceiling thermal insulation, taped & mudded painted drywall, commercial waterproof luxury vinyl plank flooring, 9,000 BTU Inverter Mini-Split Heat Pump & A/C, and Jackery Explorer 2000 Plus (2kWh LFP) + 400W solar array. Built on-site in 4 days.

Tier 3: Deluxe Sovereign Studio (Turnkey VIP)
๐Ÿ‘‘ 100% Off-Grid โ€ข Sovereign VIP
Tier 3: Deluxe Sovereign Studio (Turnkey VIP)
$29,600

Complete turnkey executive retreat. Handcrafted live-edge California walnut executive desk, fluted acoustic wood slat video-conference backdrop wall, Sherwin-Williams designer paint, commercial LVP, recessed ultra-thin LED downlights, 9,000 BTU Inverter Mini-Split, and the Sovereign Solar Hub: Anker SOLIX F3800 (3.84 kWh LFP) + 800W Monocrystalline Rooftop Solar Array. $0 electric bill forever.

2

Foundation & Site Prep

Permit-Exempt Options
Included ($0 Standard)Included
Standard Level Concrete Pier Footing Blocks

High-density pre-cast concrete pier footing block grid beneath 4x4 pressure-treated foundation skids. 100% permit-exempt, elevated, and engineered for level lawns or dirt yards.

3

Exterior Siding Style

100% Real Wood ($0 Surcharge)
100% Western Red Cedar Vertical SidingIncluded

Stained rich natural Pacific Northwest cedar with matching cedar trim.

Modern Matte Black Board & Batten๐Ÿ”’ Coming Soon

COMING SOON: Sleek contemporary matte black exterior for modern man caves and creative studios. (Currently in coating calibration โ€” join waitlist).

โš ๏ธ Coming Soon โ€” Cannot be selected online
4

Custom Lifestyle Upgrades

Mix & Match
Dark Walnut Acoustic Slat Wall preview

Dark Walnut Acoustic Wood Slat Walls

โ˜… High-Demand Upsell

Natural walnut timber slats on sound-absorbing PET acoustic felt. Eliminates Zoom echo, absorbs voice reverberation, and creates an executive speakeasy interior.

Acoustic UpgradeFrom $850 / wall
Up to 4 Walls

โœ“ Selection Scope:Standard painted interior walls or bare framing.

Example of selection: Handcrafted Live-Edge California Walnut Slab Counter on Dark Walnut Acoustic Wood Slat Wall
โ˜… Example of This SelectionTechnical Spec + Assembled Product

Handcrafted Live-Edge Walnut Slab & Acoustic Slats

9,000 BTU Inverter Mini-Split A/C & Heat Pump

Whisper-quiet high-efficiency 115V/240V heat pump for 105ยฐF summer cooling and cozy winter warmth (included in Tier 3 & Off-Grid).

+$1850
Anker SOLIX F3800 Solar Off-Grid Power Hub (800W Solar)

3.84 kWh LiFePO4 battery hub + 800W rooftop solar array + DC disconnect. Eliminates $5,000+ yard trenching and utility permits (included in Tier 3 Off-Grid).

+$6950
Handcrafted Live-Edge California Walnut Mini-Bar

2" Thick live-edge walnut slab (6' L ร— 20" D) with industrial steel mounting brackets.

Handcrafted Live-Edge California Walnut Mini-Bar preview
+$650
4-Season Climate Insulation Package

R-13 Wall batts + R-19 Ceiling radiant insulation for 105ยฐF heat defense and winter warmth.

+$950
Surface Conduit & Generator Inlet Package

External surface raceway outside wall, generator inlet pass-through, prepped for licensed C-10 contractor (CRC R105.2 permit-exempt).

+$750
Signature Cobalt Blue Recessed Under-Eave LEDs

IP67 exterior dusk architectural perimeter LED lighting with transformer.

+$350
Live Ballpark Calculation
$29,600
100% Capital-Secured Investment:$29,600
$0 Down Financing: ~$432/mo ยท Zero Day 1 Balance100% Funded Upfront
$0 Down Financing Option$432/mo
Zero out-of-pocket today with Klarna, Afterpay, or AffirmPlans & Rates
Tier 3: Deluxe Sovereign Studio (Turnkey VIP) (Timber Material Kit)$28,650
On-Site Assembly Labor (CA AB 2622 Capped)$950
Standard Level Concrete Pier Footing BlocksIncluded ($0)
100% Western Red Cedar Vertical Siding$0
100% City & State Code Compliant
โ€ข City Permit-Exempt (CRC R105.2): 120 sq ft ground footprint & under 15ft height requires ZERO building permits from Yuba City or Sutter County.
โ€ข Assembly Labor Cap (B&PC ยง 7048 / AB 2622): On-site assembly labor is strictly capped at $950 (under the statutory $1,000 minor-work threshold).
Lock In This Ballpark Quote
Select Payment / Financing Method:โšก 1-Shot Affirm Available
Stripe 256-Bit Encrypted ยท 100% Capital-Secured Project Funding ยท Zero Surprise Day 1 Balances
How Your 100% Capital-Secured Payment Works:
100% Secured Upfront
Option 1: 100% $0 Down Financing (Affirm / Klarna)

Keep your cash in the bank. Affirm or Klarna splits your total $29,600 build into low monthly payments (~$432/mo) with $0 due today. Boxpro is funded 100% upfront.

Option 2: 100% Paid in Full (Card / Bank Wire / ACH)

Pay 100% of the $29,600 investment today via card or direct bank wire to immediately lock your calendar date and secure dedicated timber procurement and solar hardware. Zero Day 1 payments.

Stripe 256-Bit Encrypted ยท Instant 60-second Affirm pre-approvalFinancing Calculator & Rates
Or Lock In Estimate First

๐Ÿ”’ Zero spam guarantee. 100% California permit-exempt structure under 120 sq ft.

๐Ÿ’ฌPrefer to Text Us Your Needs?
Text your yard size or dream build โ€” our builder will follow up directly!
๐Ÿ“ž Call (530) 443-8990
Option 2

Handyman, Junk Removal & Home Repairs

Need junk hauled, gutters cleared, drywall repaired, or a deck restored? Fill out our quick quote form below or call directly.

Send Project Details for Instant Quote

Free quote ยท No obligation ยท Replies within 2 hours

By submitting, you agree to be contacted about your request. We never spam or sell your info.

Standard Service Pricing Guide

Junk Removal Hauling
Includes dump fee & heavy labor
$275 - $775
Handyman Repairs
Half-day to full-day task blocks
$150 - $650
Lawn Care & Cleanup
Edging, mowing, weed & blow out
$75 - $250
Deck Building & Repair
Custom redwood framing & resurfacing
Custom Quote
* All pricing subject to physical on-site inspection. Zero hidden dump charges or travel fees within Yuba City, Marysville, Sutter, and Plumas Lake.

Prefer to talk right now?

Call or text Michael Snow directly. Describe your project and get an answer immediately.

(530) 443-8990

Explore Dedicated Service Showcases & Models

    Instant Ballpark Quote & Transparent Pricing | Boxpro Express Yuba City